Driveway Coating in Rogers, AR

Rogers has added thousands of new homes in recent years, and every one came with a big, bare concrete driveway. We coat driveways in Rogers, AR, protecting new and older concrete from oil, ice melt and stains while adding color and grip.

(479) 391-5142

Get a Free Estimate

Tell us about the floor. Only your name and phone are required.

Form powered by splitforms

Wide three-car driveway with a fresh gray flake coating at a newer home in Rogers, AR

New concrete and old concrete

Rogers has two kinds of driveways. In the newer subdivisions around Pinnacle Hills and out along the growing edges of town, driveways are wide, often three-car, and only a few years old. Owners want to protect them before oil spots and tire marks set in. In older parts of the city, around downtown and the neighborhoods built in the 1960s through 1980s, driveways have years of stains, small cracks and worn surfaces that a coating can clean up.

New concrete needs to cure fully, usually about 28 days, before coating. After that, the earlier you seal it, the easier it is to keep looking new.

Why coat outdoor concrete here

  • Ice melt. Northwest Arkansas gets several freezes and the occasional ice storm each winter. Salt and chemical deicers tracked in by cars can cause scaling on bare concrete.
  • Oil and fluids from cars, trucks, mowers and boat trailers soak into bare concrete and never fully come out.
  • Red clay and pollen. Spring oak and pine pollen and muddy runoff stain concrete yellow and orange.
  • Sun. Summer heat and UV wear down cheap sealers quickly.

Our coatings are UV-stable polyaspartic and polyurethane systems built for outdoor use, with anti-slip grit in the topcoat.

Boat on a trailer parked on a coated concrete driveway beside a ranch home in Rogers, AR

Lake life and heavy loads

With Beaver Lake just east of town, a lot of Rogers driveways hold a boat trailer, a camper or a side-by-side for part of the year. Trailer jacks and tongue stands concentrate a lot of weight on a small spot, and boat motors drip oil and fuel. We recommend a flake system with a thicker topcoat for those driveways, plus a pad or plate under jack stands. Spills wipe up instead of soaking in.

Rocky ground and cracks

Much of Benton County sits on limestone and chert with clay pockets in between, and soils can shift or settle unevenly. Cracks in Rogers driveways are common even on newer homes. We fill cracks with a flexible material before coating and grind down small lips at joints. Moving cracks may show through over time, but filling and coating them keeps water out, which helps prevent further damage.

How we coat a driveway

  1. Estimate. We look at the slab, check for sealers and moisture, and go over colors.
  2. Grind. Diamond grinding gives the coating a surface to grip.
  3. Repair. Cracks and chips are filled.
  4. Color and flake. A base coat goes down, then flake if you choose it.
  5. Topcoat. A UV-stable clear coat with grit for traction.

Most driveways take one or two days. You can drive on it after about a day or two depending on temperature. We work spring through fall and pick dry, mild days for the best bond.

HOAs and color choices

Many Rogers neighborhoods have HOA rules on exterior changes. Neutral grays and tans usually get approved without trouble, and we can bring samples for your HOA. Lighter colors stay cooler in summer and show less dust.

Upkeep

Rinse it, sweep it and wipe spills when they happen. In winter, use sand or a coating-safe ice melt, and a plastic shovel. A new topcoat every several years keeps the finish looking good.

Common questions

Can I coat a driveway that has been sealed before? Yes, but the old sealer has to be ground off first so the new coating can bond to bare concrete.

Will a coated driveway be slippery in the winter? The grit in our topcoat gives good traction in rain and frost. No surface is truly safe under a glaze of ice, so we still recommend sand or a coating-safe melt during ice storms.

Do you coat just part of a driveway? We can, for example the apron near the garage where most oil drips happen, though most people like the look of the whole drive done at once.

What if my builder already sealed it? Many new homes get a thin clear sealer at closing. It wears off within a year or two and has to be removed by grinding before a real coating goes down.

Other services

Want a matching garage? See our garage floor epoxy page. If you just want protection, try concrete sealing. We also coat driveways in Bentonville, Lowell, Pea Ridge and Cave Springs.

Protect your driveway

Call (479) 391-5142 to set up a free estimate.